Contractor Responsibilities for Construction

Prior to Construction:

  • Obtain building permits.
  • Provide Liability insurance coverage to $3,000,000.00.
  • Provide proof of good standing with WCB.
  • Provide Landlord with complete set of construction drawings for approval.
  • Provide Landlord with list of sub-trades.
  • Provide construction schedule.


During Construction:

  • Wrap office blinds to keep clean.
  • Display building permits on premises.
  • Keep common areas clean AT ALL TIMES.
  • No tools or equipment to be cleaned in the building putting drywall dust or paint into our plumbing or drainage system.
  • No noise is permitted during normal business hours: Hammering, drilling, radios etc.
  • No parking in loading bays; unloading and loading only.
  • Elevators must be booked in advance: Minimum notice prior to one o’clock on day before required; booked on first come first served basis on availability.
  • Access cards and keys to be requested with one days notice.
  • X-rays may be required prior to coring. If required the Landlord is to be provided with the x-ray for review prior to coring. Coring is permitted only between the hours of 6:00 p.m. to 7:00 a.m.


Upon Completion:

  • Provide Landlord with a full set of as built drawings.
  • Apply for and provide to the Landlord Occupancy Permits.
  • All electrical outlets to be identified and circuits labeled on panel.
  • Area to be left clean with all construction debris removed and disposed of.
  • Construction clean to be completed, including windows, and premises left ready for occupancy.


General Information:

  • Elevator hours are between 9:30 and 11:30 and between 1:30 and 3:30.
  • Our buildings do not have a parking area for contractors. Loading bays cannot be used for parking and are provided for loading and unloading only. Use of the loading bays under any circumstance must be booked with the management office. Call 604-683-2141.