Building Systems
Building Hours, Access:
The Flack Block is kept locked at all times. All Tenants are provided with an security access card. Contact Aoife via email at adillon@westpenderproperty.com to order your cards.
Please note that for the protection of the building and other tenants we request that you do not provide access to any persons you do not know.
Heating and Air Conditioning:
Standard operating hours for the building’s heating and cooling systems are from 6:00 am to 6:00 pm, Monday through Friday. Any additional HVAC services can be provided, by request, through the Management Office which may be at an additional cost. Requests for additional HVAC service must be placed in writing at least 24 hours in advance. For further information, please contact the management office.
If you need adjustments to the temperature within your office, please place a service request via the link on our website or email Aoife at adillon@westpenderproperty.com
Lighting:
There is a computerized lighting control system in this building which controls the corridor lighting. Corridor lights are turned off at 7:00 p.m. but there is an override switch for 2 hours located near the women’s washroom on each floor. Other lights found still on after hours are turned off by our cleaning staff and/or security.
In our ongoing effort to save energy, we ask that you please have the last staff member to leave your offices turn off the lights. It is especially important for those working on the weekends to turn off the lights when they leave.
We also encourage you to consider installing separate light switches for rooms that are not used all the time. These lights could then be turned off when rooms are not in use.
Telecommunications:
The building has been wired with a fibre optic network. This service is provided by Telus, Metro Bridge Networks Corporation and Radiant.
The installation of any new telephone and data communications systems must have prior approval of the Landlord. Once you have obtained approval, should you wish to proceed with the installation, please ensure that your contractor arranges for access to our building equipment with our operations staff in advance. Access to the telephone and electrical rooms without prior arrangements cannot be provided.